{"section":{"heading":"Ähnliche Bilder und Videos (2)","tiles":[{"href":"/de/st/0869628006","title":"NUWAKOT, NEPAL - OCTOBER 15: Local residents cross the newly installed Bailey bridge connecting the border areas of Nuwakot and Rasuwa districts on October 15, 2026 in Nuwakot, Nepal. The bridge was installed to restore road connectivity after severe flooding destroyed existing bridges on August 26, 2026.  Copyright: xChinaxNewsxServicex 111674496482","thumbnailUrl":"https://www.imago-images.de/bild/st/0869628006/s.jpg","credit":"IMAGO / VCG","licences":[{"key":"1","name":"Standard","figure":"29 €"},{"key":"2","name":"Extended","figure":"99 €"}]},{"href":"/de/st/0871282521","title":"NUWAKOT, NEPAL - OCTOBER 29: Local residents cross a newly built suspension bridge between Bidur and Trishuli towns in the disaster-affected Nuwakot district on October 29, 2026 in Nuwakot, Nepal. The Nepalese government has preliminarily estimated that the total cost for post-disaster reconstruction following the August 26 landslides exceeds $4.7 billion.  Copyright: xChinaxNewsxServicex 111678013221","thumbnailUrl":"https://www.imago-images.de/bild/st/0871282521/s.jpg","credit":"IMAGO / VCG","licences":[{"key":"1","name":"Standard","figure":"29 €"},{"key":"2","name":"Extended","figure":"99 €"}]}]}}